After the production of defective materials in the workshop is confirmed by IPQC, a "Return Material Form" is opened and returned to the warehouse after production, PMC supervision and approval.
After the workshop production of bad materials has been confirmed by IPQC, the "return order" shall be issued by production, PMC supervisor, and approval and withdrawal.
After the workshop's production of non-performing materials is confirmed by IPQC, a "material return sheet" shall be issued for the production, PMC supervisor and approval of warehouse withdrawal.<br>