Liquid leakage in 1, 6#3#7# had lower alkali cashmere pipelines, the reason is an excuse to lower pipeline loose living.Solution: manufacturers directly to the interface with the electrode weldingMan-made reasons: employees and vendors often walk around the pipe, resulting in loose groundPreventive measures: verbally inform employees not to trample the liquid discharge pipe, and place the metal bridge aisle at the top of the pipe.2, alkali cashmere 1#7 month 24 found that the operation of the computer on the table, after the investigation found that the fixed computer arm screws only three, of which there are two out of the screw is not tight.Solution: add a screw, the screw with the waterproof adhesive tape, tighten.Preventive measures: weekly inspection on the top of the machine; inform the operator interface of the staff do not have a large swing of the operating surface.
การแปล กรุณารอสักครู่..
