Problem analysis: 1 missing or reported production production production data is wrong, need to check the output data of production.
problems 2.BOM the number of components (too large), need to give check technology.
using 3 alternative materials. The need to remove the error, do issue will be the actual use of the material.
4.2014 years December workshop inventory data error, lead to buckle material stock shortage.
problem types: needs no material production storage, purchase records, but the production material requirements.
problem analysis: 1.BOM components appear problem, the actual use of BOM theory and the data is inconsistent, need of production, technology to check.
using 2 alternative materials,Errors will be deleted after, will the actual use of the materials consumption.