1, this quotation range increases the steel structure workshop and building envelope, civil engineering. That is, the existing work scope: steel structure plant 2050t (this increase), steel platform 2525t, color steel plate roof panel about 200t (this increase), the civil engineering cost of rmb.
การแปล กรุณารอสักครู่..
