(1) in the preparation of construction organization design (or construction scheme), should have the fire safety requirements. If the construction site layout, set up temporary engineering (temporary buildings) to build a position, fire safety management of electricity and inflammable and explosive materials, site fire facilities and fire protection responsibility system should be according to the requirements of fire fighting carefully considered and implemented.(2) the construction site should be clearly divided into the use of fire areas, flammable, combustible materials dumps, warehouses, flammable waste concentration and living areas, etc.. The spacing between the various regions to meet the requirements of fire prevention.(3) to build a shed or temporary dormitory and spacing to meet fire safety requirements. 1 temporary quarters as much as possible to build the leave the building 20m away; shed shall take at the bottom of the high voltage overhead transmission lines, and high voltage overhead line keep a safe distance. The shed top height is generally not less than 2.5m. The number of residential quarters, not more than 100 people, every 25 people have a direct access to the door, the door width of not less than 1.2m, while the door must be open to the outside. All the overhead lines shall be insulated with fixed porcelain, wiring through walls, must pass from porcelain, hard plastic tube. The fire operation must be approved by the relevant departments, will be hot. The warehouse, wood shed and flammable materials (deposit) on the heap etc., should be posted (suspension) fire striking marking. Fire, the construction site must be equipped with a sufficient number of fire fighting facilities and equipment. Such as fire prevention tools (fire bucket, ladder, shovels, a safety hook, etc.), sand box (pool), fire water tank (tank), fire hydrants and fire extinguishers. We should establish fire safety responsibility system, and divide the fire area of responsibility.
การแปล กรุณารอสักครู่..